We passed the city inspections of the rough on Monday. Our structural engineer wanted one more tie down though (and the chance to send one more bill as well I suspect).

Anyway. Walls are going in finally. Sheetrock installation is extremely noisy and we're in for more serious dust when they start the mudding and sanding. Once that is done and dry, we have about a week of hardwood floor installation.

I also ordered tile for the bathroom this week. It will be a creamish color Halila limestone in 18x18 with 1x1 on the shower floor. There will also be a decorative border around the floor in tiny stone tiles that are more reddish and brown mosaic. For some reason, I forgot to take pictures at the tile store. Oh well, it should come in pretty quickly.




Skylight in closet. Still needs to be ordered and installed. Pretty sure the rain is done until like November now.